 |
Pilot plant scale testwork, normally carried out at the client's site, allows observation of a plant running at conditions very similar to those of full-scale operation.
The efficiency of loading and regeneration procedures, under conditions obtained from laboratory trials, can be confirmed and modified if required.
- On completion of pilot trials process guarantees on the main plant are given.
- Extended tests can be performed to confirm the loading and regeneration parameters obtained from laboratory trials to achieve optimum operation of the plant.
- Pressure-drop changes and viscosity effects, can be monitored, which are not normally observed in laboratory-scale units due to size constraints and the low resin volumes used.
- The effects of any suspended solids within the process feed can be measured, and the requirements for pre-filtration equipment or backwashing facilities can be confirmed.
- Service requirements for the plant can be determined, and data necessary for operating procedures for the main plant can be collected.

|
|
 |
|
If you would like further information about any of the services we offer, please don't hesitate to contact us.
"Mill Race", Compton Abdale, Cheltenham, Gloucestershire GL54 4DR United Kingdom
Tel: +44 (0)1242 890178 Fax: +44 (0)1242 890179
E-Mail: Please use the contact form in Contact Us
|
 |
 |
|